Texas Instruments THS0842 EVM User Guide, Specifications, Owner's Manual
Summary
THS0842EVM evaluation module user guide for TI THS0842 8-bit 40MSPS ADC. Provides analog input connectors, clock options, digital outputs, and configuration jumpers for evaluating SNR, SINAD, THD, SFDR. Covers board layout, jumper settings, power requirements, test circuits, and data capture software. For engineers evaluating ADC integration.
Manual Details
| Brand | Texas Instruments |
|---|---|
| Pages | 37 |
| File Size | 505.86 KB |
| Published | June 16, 2026 |
Enter the captcha to get the download link:
Frequently Asked Questions
What is the purpose of the THS0842 EVM?
The THS0842 EVM is an evaluation module for the THS0842 device.
What are the power requirements for the THS0842 EVM?
Refer to Section 1.3 for voltage limits and power requirements.
Does the EVM support external clock input?
Yes, it provides both internal and external clock options, detailed in Section 2.3.
How are the analog inputs configured?
The EVM offers both single-ended transformer coupled and differential interfaces.
Where can I find the board layout and grounding guidelines?
Layout, decoupling, and grounding considerations are covered in Chapter 3.