Texas Instruments SRC4192EVM Data Sheet / Manual
Summary
This Evaluation Module (EVM) from Texas Instruments is designed exclusively for engineering development and prototyping, not for commercial use. The comprehensive manual provides documentation on the circuit's components, including sample rate converters and digital audio interface units. It serves as a critical resource for electronics engineers and developers conducting preliminary testing and evaluating data conversion solutions, while providing essential hardware guidelines and warranty disclaimers for non-commercial applications.
Manual Details
| Brand | Texas Instruments |
|---|---|
| Pages | 39 |
| File Size | 1.08 MB |
| Published | June 18, 2026 |
Enter the captcha to get the download link:
Frequently Asked Questions
Is this product for commercial use?
No, this evaluation kit is intended for ENGINEERING DEVELOPMENT OR EVALUATION PURPOSES ONLY.
If the EVM doesn't meet specifications, what is my option?
The kit may be returned within 30 days from the date of delivery for a full refund.
Am I responsible for FCC, UL, or CE compliance?
No. The products received may not be regulatory compliant or agency certified (FCC, UL, CE, etc.).
What must users do when handling these components?
The user assumes all responsibility and liability for proper and safe handling of the goods.