Texas Instruments ADS1271EVM & ADS1271EVM-PDK Data Sheet Manual
Summary
The ADS1271EVM is a high-performance, modular evaluation module designed for testing the capabilities of the ADS1271 24-bit Analog-to-Digital Converter (ADC). This comprehensive manual guides engineers and developers through every aspect of the board, including analog/digital interface configuration, power supply management, schematics, and operation details. Suitable for prototyping advanced measurement systems using DSPs or microcontrollers, the EVM offers a full kit experience with accompanying software for immediate system development.
Manual Details
| Brand | Texas Instruments |
|---|---|
| Pages | 16 |
| File Size | 369.37 KB |
| Published | June 04, 2026 |
Enter the captcha to get the download link:
Frequently Asked Questions
What is the main function of the ADS1271EVM?
It is a full-featured evaluation board for the ADS1271 24-bit Analog-to-Digital Converter.
Is this EVM compatible with third-party boards?
Yes, it's compatible with the 5-6K Interface Board and other boards like HPA449 and Speedy33™.
What does the ADS1271EVM-PDK include for software use?
The package includes a USB-based DSP-based motherboard (MMB0) and evaluation software for use with a PC running Windows™ operating systems.
How can signals be applied to the module?
Signals can be routed through J1, or brought in via auxiliary inputs at J4 and J5.