Page 1
Dell Force10 S50N and S50V Systems Quick Start Guide Regulatory Model: S50N/S50V
Page 3
Dell Force10 S50N and S50V Systems Quick Start Guide Regulatory Model: S50N/S50V
Page 4
Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps you make better use of your computer. CAUTION: A CAUTION indicates potential damage to hardware or loss of data if...
Page 5
About this Guide This document is intended as a Quick Start Guide to get new systems up and running and ready for configuration. For complete installation and configuration information, refer to the f...
Page 6
About this Guide
Page 7
Installing the Hardware This guide assumes all site preparation has been performed before installing the chassis. Installing the Chassis To install the S50 chassis, Dell Force10 recommends that you co...
Page 8
Step Task Dell Force10 recommends that one person hold the chassis in place while a second person attaches the brackets to the posts. Attach the bracket "ears" to the rack or cabinet posts, ...
Page 9
You must provide your own cables to connect to the power source. Cables must be sized for 11.5 A service at no more than -48VDC input (per NEC in the United States; internationally, follow local safet...
Page 10
CAUTION: You can insert and connect XFP transceivers while the switch is operating. You can also disconnect and remove XFP transceivers while the switch is operating. However, inserting or removing th...
Page 11
All protective covers are in place. Blank panels are installed if optional modules are not installed. NOTE: A US AC power cable is included in the shipping container for powering up an AC power supply...
Page 12
Power Supplies On both the S50N and S50V, either the AC or DC power supplies alone are sufficient to power the switch. When both AC and DC power supplies are connected, they act in roughly a 60%/40% l...
Page 13
Environmental Parameters Parameter S50N and S50N-DC S50V Specifications Specifications Temperature Operating: 32° to 122°F (0° to Operating: 32° to 122°F (0° to 50°C) 50°C) Non-operating (storage Non-...
Page 14
DC Power Requirements Parameter S50N and S50N-DC S50V Specifications Specifications Nominal input voltage -48V to -54V -48V to -54V Maximum current S50N-DC: 3.6 A at -48 VDC S50V: 11.5 A @ -48VDC draw...
Page 15
Installing the Software Navigating CLI Modes The FTOS prompt changes to indicate the CLI mode. You must move linearly through the command modes, with the exception of the end command which takes you d...
Page 16
Step Task Install the RJ-45 copper cable that is shipped with the S50V system into the console port. CAUTION: You must install a straight-through RJ-45 copper cable (a standard Ethernet cable) into th...
Page 17
Table 2-1. Pin Assignments for Console Port Signal RJ-45 Pinout GND GND TXD NC NC Default Configuration A version of FTOS is pre-loaded onto the chassis, however the system is not configured when you ...
Page 18
Characters within the string can be letters, digits, and hyphens. Task Command Syntax Command Mode Create a new host name. hostname name CONFIGURATION Access the System Remotely You can configure the ...
Page 19
Configure the Enable Password The EXEC Privilege mode is accessed by the enable command. Configure a password as a basic security measure. When using a console connection, EXEC Privilege mode is unres...
Page 20
Assign Interfaces to a VLAN A port may either be an untagged member of a single VLAN, or a tagged member of perhaps multiple VLANs. Untagged Ports — ports that do not append an 802.1Q VLAN tag to fram...
Page 21
Connecting the Chassis to the Network Once you have completed the hardware installation and software configuration, you can connect to your company network by following your company’s cabling requirem...
Page 22
Installing the Software
Page 24
Printed in the U.S.A. www.del .com | support .del .com