Texas Instruments-ADS8365EVM-Readme-Page-Thank-You-Letter
Summary
This resource provides comprehensive support for the ADS8365/ADS8364M Evaluation Module (EVM). Whether you are an engineer integrating this component into a new design or require detailed technical specifications, access the complete User's Guide and Data Sheet. This documentation is essential for developers and designers needing robust details to ensure accurate implementation and application within their advanced electronic systems.
Page 1 Text Content
THANK YOU
FOR PURCHASING AN ADS8365M-EVM
FOR UP TO THE MINUTE DOCUMENTATION GO TO
THESE URLs
ADS8365/8364M-EVM USER’S GUIDE
http://www-s.ti.com/sc/techlit/slau189
ADS8365 DATA SHEET
http://www-s.ti.com/sc/ds/ADS8365.pdf
SLAL127A 12/5/06 RM-8365
Page Summary Contents For Texas Instruments-ADS8365EVM-Readme-Page-Thank-You-Letter
Manual Details
| Brand | Texas Instruments |
|---|---|
| Pages | 2 |
| File Size | 13.89 KB |
| Published | May 28, 2026 |
Enter the captcha to get the download link:
Frequently Asked Questions
Where can I find the user's guide and data sheet for this device?
The user’s guide is available at ADS8365/8364M-EVM USER’S GUIDE and the data sheet here: http://www-s.ti.com/sc/ds/ADS8365.pdf.
Does TI provide specific support for application design?
No, TI assumes no liability for applications assistance or customer product design; customers are responsible for their own products.
Are there any restrictions on reproducing the technical information?
Reproduction is permissible only if it is without alteration and is accompanied by all associated warranties, conditions, limitations, and notices.