# A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

Agilent Technologies LC Systems for LC-MS Mass Spectrometers Systems - Pre-Installation Instructions & Manuals

Summary

Ensure seamless setup of your Varian LC/MS Mass Spectrometer System. This comprehensive guide provides essential pre-installation instructions and a detailed checklist, ensuring all site requirements are met before the expert representative arrives. It covers critical aspects such as safety compliance, required power specifications, proper environmental controls (temperature and humidity), bench capacity, and material readiness. Essential reading for laboratory managers and technical staff responsible for preparing a functional and compliant environment for optimal system performance.

📄 Preview 📖 Table of Contents Contents PAGE OF 10

Page 1 Text Content

Varian LC Systems for LC/MS Mass Spectrometers Systems Pre-installation Instructions

Checklist NOTE: Do not unpack the boxes. Check off each box after satisfying each requirement as described in the instructions. All requirements must be met before requesting installation.

NOTE: If the site is not ready for installation when the Varian Representative arrives, Varian, Inc. reserves the right to invoice for the Representative’s time.

Requirements  Installation site is in compliance with all relevant safety regulations.  User Representative will be available during the installation and Varian certification period. Entrance to the installation site is at least 92 cm (36 in.) wide.  Bench space is sufficient for all modules.  Bench can support system weight.  Bench does not vibrate.  Temperature maintained between 16 and 30 °C.  Relative humidity maintained between 20 and 80%.  Installation site is free of excessive particulate matter.  Specified electrical supply and power outlets are installed.  Materials and solvents of specified grade are on site.  Shipping cartons were inspected for damage. If there was any damage, the damaged shipping carton procedure was completed.

Requesting Installation After preparing your site, contact the Customer Service office in your region to schedule installation.

395421200: 1 1 of 10 Pre-installation Instructions

Page Summary Contents For Agilent Technologies LC Systems for LC-MS Mass Spectrometers Systems - Pre-Installation Instructions & Manuals

Page 1 Varian LC Systems for LC/MS Mass Spectrometers Systems Pre-installation Instructions Checklist NOTE: Do not unpack the boxes. Check off each box after satisfying each requirement as described in the i...
Page 2 Contents Introduction................................................................... Particulate Matter ....................................................7 Safety Power Requirements................
Page 3  Check off the checklist box: User Representative will be available during the installation and Varian certification period. Entrance Before arranging for delivery of the LC/MS, determine that there ...
Page 4 212-LC and Pro Star 410 Autosampler with the 500-MS Figure 1 Typical Layout of the 500-MS with the 212-LC pumps Figure 1 shows an example of the 500-MS LC/MS with the 212-LC pumps and the Pro Star 410...
Page 5 The following provides bench space and load information for a 212-LC with a Pro Star430. Table 4has the bench space information. Table 5 lists the weights of the LC modules for the Pro Star410 without...
Page 6 Table 7 lists the dimensions and weights of the 216-LC system. The Pre-installation Instructions for the LC/MS has the information for the MS and computer. Table 7 Bench Space and Bench Load Bench Ben...
Page 7 Particulate Matter Your installation site must not have excessive dust, smoke, or other particulate matter. Particulate matter may block airflow vents causing the electronics to overheat.  Check off ...
Page 8 Table 9 Solvents for n ESI Quantity Solvent Water with 0.1% formic acid LC-MS CHROMASOLV®, 1 each 2.5-liter bottle total impurities 0.093-0.107 % (v/v) formic acid from Sigma Aldrich Part Number 34673...
Page 9 When the LC/MS Arrives Inspecting the Shipping Cartons After the LC arrives, carefully inspect the exterior of the shipping cartons for evidence of any damage that might have occurred during shipment....
Page 10 Unpacking and Installing The Varian Representative will review the Pre-installation Checklist with you to ensure that you satisfy all of the site requirements. The Varian Representative will unpack an...

Manual Details

Brand Agilent Technologies
Pages 10
File Size 699.79 KB
Published May 13, 2026
105 views

Enter the captcha to get the download link:

captcha

Frequently Asked Questions

What environmental conditions must the installation site maintain?

The temperature must be maintained between 16 and 30 °C, and relative humidity between 20 and 80% in a particulate matter-free area.

Who is responsible for system upkeep after installation?

The user is responsible for performing routine and preventive maintenance of the LC, autosampler, MS, and data system.

What safety requirements must I confirm before scheduling installation?

You must ensure the site complies with all relevant local safety regulations and that there is sufficient clearance to move the shipping container.

When can I begin analyzing samples after the unit arrives?

Plan to analyze your samples only after the installation is complete and you have accepted the conditions of delivery, which requires at least three days.